Farewell to Andrew Bowhay
![](https://static.wixstatic.com/media/b8f7b3_150da05d0a254cb49cb3c58c3bba43f8~mv2_d_2190_2272_s_2.jpg/v1/fill/w_147,h_153,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/b8f7b3_150da05d0a254cb49cb3c58c3bba43f8~mv2_d_2190_2272_s_2.jpg)
Andrew first joined the SMK team in 2014, and has been a valuable part of the company since that time.
His work at SMK Consultants has covered a wide variety of projects from large scale cotton operations, weir design, geotechnical site classifications, feedlot design, major pipeline and large scale storage dam designs. Andrew’s work is supported by a range of technical skills, such as GPS surveying, CAD design software and technical soil investigation and analysis (such as EM surveys).
He is now moving on to pursue a local career in precision agriculture.
We are pleased to wish Andrew well and all the best for the future.